If you are buying a Florida condominium in a building of three or more stories, two reports now sit at the center of the purchase: the milestone inspection and the structural integrity reserve study, usually shortened to SIRS. One looks at the building’s structure today. The other plans how the association will pay to repair and replace major components over time. This article explains what each one is under current Florida law, the deadlines, and the documents to ask for before your cancellation window closes.
This is general information, not legal advice. The statutes below were amended several times between 2022 and 2025. Have a Florida real estate attorney review the association’s documents for your specific purchase.
The milestone inspection (s. 553.899, Florida Statutes)
Which buildings
Section 553.899 applies to buildings that are “three habitable stories or more in height” and are wholly or partly condominium or cooperative residential property. It does not apply to single-family, two-family, three-family or four-family dwellings with three or fewer habitable stories above ground.
What it is
The statute describes a structural inspection of load-bearing elements and primary structural members, performed by an architect or engineer licensed in Florida, to attest to the “life safety and adequacy of the structural components of the building.” It has two phases:
- Phase one is a “visual examination of habitable and nonhabitable areas of a building,” with a qualitative assessment of structural conditions.
- Phase two is required only if phase one finds substantial structural deterioration. It may include destructive or nondestructive testing at the inspector’s direction.
When it is due
The first milestone inspection is due by December 31 of the year the building reaches 30 years of age, counted from its certificate of occupancy. The local enforcement agency may instead require it by December 31 of the year the building reaches 25 years, for example for buildings near salt water. After the first one, it repeats every 10 years. Buildings that reached 30 years before July 1, 2022 had to complete the initial inspection before December 31, 2024.
The timeline once it starts
- The local enforcement agency sends written notice by mail, return receipt requested.
- The association must notify unit owners within 14 days after receiving that notice.
- Phase one must be completed within 180 days after the owners receive the notice.
- Within 45 days of receiving the report, the association must send the inspector-prepared summary to every unit owner, whatever it found, post it in a conspicuous place on the property, and publish the report and summary on its website if it is required to have one.
- If a phase two report recommends repairs, the repairs must be commenced within 365 days after receiving the report.
The structural integrity reserve study (s. 718.112(2)(g))
What it covers
Under section 718.112(2)(g), a residential condominium association must have a SIRS for each building that is three habitable stories or higher. The study must cover the roof; the structure, including load-bearing walls; fireproofing and fire protection systems; plumbing; electrical systems; waterproofing and exterior painting; windows and exterior doors; and certain other items, which the statute ties to a cost that “exceeds $25,000 or the inflation-adjusted amount determined by the division.”
Who prepares it and how often
It must be completed at least every 10 years after the condominium’s creation, by an engineer or architect licensed in Florida, or by a reserve analyst holding one of the professional credentials the statute names. Associations that existed on or before July 1, 2022 and are controlled by unit owners had to complete the study by December 31, 2025. An association that must also complete a milestone inspection by December 31, 2026 may do both together, but the statute says, “In no event may the structural integrity reserve study be completed after December 31, 2026.”
Funding rules buyers should know
- For budgets adopted on or after December 31, 2024, a unit-owner-controlled association required to have a SIRS “may not determine to provide no reserves or less reserves than required” for the SIRS items.
- Members may not vote to use those reserve funds, or the interest on them, for any other purpose.
- There is a limited exception: for budgets adopted on or before December 31, 2028, an association that completed a milestone inspection within the previous two calendar years may, with majority approval of the total voting interests, temporarily pause or reduce reserve contributions for up to two consecutive annual budgets to fund the repairs the inspection recommends.
Why this matters to a buyer: the SIRS drives the reserve line in the budget, which drives the monthly assessment. If reserves are underfunded against the study, the gap is usually closed through higher assessments, a special assessment or a loan. Read the study alongside the current budget and the board minutes.
Reporting to the state, and how to check it
Within 45 days after receiving a SIRS, the association must give the Division of Florida Condominiums, Timeshares, and Mobile Homes a statement that the study was completed and made available to owners. DBPR’s SIRS reporting page calls the study a “budget planning tool,” says associations had to create an online account with the division by October 1, 2025, and publishes lists of associations that have submitted reports, with information “displayed exactly as submitted.” Checking whether an association appears there is a quick first step. It is not a substitute for reading the study itself.
What a resale buyer is entitled to
Section 718.503(2)(a) says a prospective purchaser under contract for a condominium unit is entitled, at the seller’s expense, to current copies of the declaration, articles of incorporation, bylaws and rules, the annual financial statement and budget, “the inspector-prepared summary of the milestone inspection report” if applicable, the most recent SIRS “or a statement that the association has not completed a structural integrity reserve study,” the turnover inspection report where it applies, and the “Frequently Asked Questions and Answers” document. The statute requires the resale contract to include a cancellation clause with a window of 7 days, excluding Saturdays, Sundays and legal holidays. Read the section for when that window begins, and ask your attorney how it fits your contract.
A document checklist for condo buyers
- The milestone inspection summary (and the full report, if posted on the association’s website), or written confirmation of when the building’s first inspection is due.
- Whether a phase two inspection was required, what it recommended, and whether repairs have started within the 365-day period.
- The most recent SIRS, its date and who prepared it.
- The current budget, showing reserves for each SIRS item, and the last two years of financial statements.
- Board and owner meeting minutes for the past 12 months, looking for discussion of assessments, loans or deferred projects.
- Any special assessment that has been adopted or proposed, and who pays it if it is levied after closing.
- Whether the association has paused or reduced reserves under the post-inspection exception, and for which budget years.
- The association’s entry on the DBPR SIRS reporting lists.
Lenders and insurers often ask for some of the same documents, so collect them early. Your lender can tell you what it needs to approve a loan in a particular building, and an insurance agent can tell you how the association’s master policy interacts with the policy you will need.
How I help
When I work with condo buyers in Florida, I request the milestone and SIRS documents as soon as a contract is signed and line them up against the budget, so we know what questions to take to the association, the lender and your attorney before the cancellation window runs. I don’t interpret the engineering or the law; I make sure the right documents reach the people who do.